The 1040 metre-long route spans the 262-metre height differential between the two end stations. It can handle 500 passengers per hour. The Chairlift was constructed in 1970. The Chairlift, which runs between the saddles of Zugliget (nook grove) and John Hill (János Hegy), was opened in 1970. In poor weather conditions the Chairlift operates periodically, and [...]
Read the full article
